1 00:00:00,160 --> 00:00:02,440 Speaker 1: If approved, the goal is to start construction of the 2 00:00:02,480 --> 00:00:05,240 Speaker 1: bicycle pedestrian bridge by the fall up next year and 3 00:00:05,240 --> 00:00:07,720 Speaker 1: complete it by the end of twenty twenty nine. That's 4 00:00:07,760 --> 00:00:10,720 Speaker 1: what was presented by mass Doot at a recent virtual hearing, 5 00:00:10,960 --> 00:00:14,640 Speaker 1: including the bridge's twenty five percent design, connecting Assembly Rows, 6 00:00:14,720 --> 00:00:17,520 Speaker 1: Draw seven Park to the Northern Strand Trail by Encore 7 00:00:17,560 --> 00:00:20,760 Speaker 1: Casino and Everett. Now, these locals and Assembly Row feel 8 00:00:20,800 --> 00:00:22,120 Speaker 1: mostly positive about it. 9 00:00:22,160 --> 00:00:23,599 Speaker 2: For us living here, I mean, it would be a 10 00:00:23,600 --> 00:00:25,840 Speaker 2: way for us to go over to the casino. 11 00:00:25,560 --> 00:00:27,520 Speaker 3: Kind of avoid traffic on the other side. So it's 12 00:00:27,520 --> 00:00:30,200 Speaker 3: sort of just like this direct access to the casino, 13 00:00:30,280 --> 00:00:31,080 Speaker 3: so that it's a good thing. 14 00:00:31,120 --> 00:00:32,599 Speaker 4: It's going to be a good scenic view, so it's 15 00:00:32,600 --> 00:00:33,599 Speaker 4: going to be a good plus. 16 00:00:33,680 --> 00:00:36,199 Speaker 1: Mass Doot says Once complete, the bridge will serve as 17 00:00:36,240 --> 00:00:39,199 Speaker 1: a critical missing link in the region, enhancing access to 18 00:00:39,240 --> 00:00:44,080 Speaker 1: local transportation at Assembly Row in Somerville. James Rojas WBZ, 19 00:00:44,600 --> 00:00:45,960 Speaker 1: Boston's news radio