1 00:00:00,720 --> 00:00:03,280 Speaker 1: Traffic is once again flowing on the bly Bridge after 2 00:00:03,320 --> 00:00:07,480 Speaker 1: closing back in twenty thirteen. Construction and repairs on the 3 00:00:07,480 --> 00:00:10,520 Speaker 1: bly Bridge began in twenty twenty one. A temporary bridge 4 00:00:10,560 --> 00:00:12,800 Speaker 1: was used in the meantime to connect Saugust and Linn. 5 00:00:13,039 --> 00:00:17,360 Speaker 2: It took quite a while, honestly, quite a while to do, 6 00:00:17,440 --> 00:00:18,280 Speaker 2: you know, to fix it. 7 00:00:18,360 --> 00:00:21,000 Speaker 1: Jonathan is walking across the bridge. He thinks this will 8 00:00:21,079 --> 00:00:24,240 Speaker 1: lead to improved traffic and business for both Limb and Saugust. 9 00:00:24,440 --> 00:00:26,200 Speaker 3: I think it would look I think it would be great. 10 00:00:26,960 --> 00:00:29,520 Speaker 1: The bridge is only partially opened, with only one lane 11 00:00:29,520 --> 00:00:32,520 Speaker 1: in each direction open at this time. In Lynn James 12 00:00:32,600 --> 00:00:35,800 Speaker 1: Rojas WBZ, Boston's news radio